REI has provided engineering design and permitting at the state and local level, including Act 250 and several amendments for the large scale residential development. We have obtained permits and renewed permits as necessary, and we continue to provide construction review and permit-related inspections. We have provided site design, stormwater system design, roadways, sidewalks, cut […]
Month: June 2014
Jolley Wagon Wheel
Ruggiano Engineering completed site permitting and design for the redevelopment of the existing refueling station, convenience store, and a four-bay automatic car wash at the Wagon Wheel Truck Plaza off I-89, Exit 19 in St. Albans. The redevelopment also included eliminating the previously existing tractor trailer repair shop. The project included a combined stormwater collection […]
ACE Hardware
Ruggiano Engineering, Inc. provided engineering services for the ACE Hardware project site, which is located at the corner of Congress Street and Main Street in downtown St. Albans City. This unique project included redevelopment of a site where environmental contamination was found to be present, which entailed extensive investigation, coordination and permitting with the Vermont DEC. Old hydraulic lifts […]
Champlain College
Champlain College introduced its Master Plan in 2007 to address the needs and services of the College over the next 10-15 years. The Master Plan provides for additional student housing on campus, study and activity areas, academics spaces and administrative facilities. A major feature of the Master Plan is the Res-Tri project that included three […]
New England Federal Credit Union
Ruggiano Engineering, Inc. provided complete site design, local and state permitting and construction oversight for the construction of this financial establishment in St. Albans. REI worked closely with the client and a large design team that included the building architect, MEP and structural engineers to ensure the site design integrated seamlessly with all other aspects […]